The Full-PU running track system

IAAF Certificated System 13.5 mm 

Class 1 

Poured-in-place running track surface of impermeable design is installed in a multi-layered application.

The base layer consists of two-component polyurethane, followed by SBR rubber, a middle layer of two component polyurethane/SBR, and a top layer of flow-applied layer of identically-pigmented polyurethane. Finally, the track is broadcast with EPDM rubber or spray special colorful spray-coat material mix with EPDM rubber.

The layout, track lines and event markings are in accordance with the latest edition of the IAAF rules and regulations.